Tayaran Bridge

  • Client: The Egyptian Ministry of Defense and Military Production
  • Location: Nasr City, Cairo, Egypt
  • Dimensions: 720 meters (Length) and 21 meters (Width)
  • Total Concrete: 17, 500 m3
  • Steel Reinforcement: 4300 tons
  • Steel Structure: 450 tons
  • Duration: 45 days
  • Scope of Work: Construction of two-way bridge (three lanes in each direction)