Tayaran Bridge
- Client: The Egyptian Ministry of Defense and Military Production
- Location: Nasr City, Cairo, Egypt
- Dimensions: 720 meters (Length) and 21 meters (Width)
- Total Concrete: 17, 500 m3
- Steel Reinforcement: 4300 tons
- Steel Structure: 450 tons
- Duration: 45 days
- Scope of Work:Â Construction of two-way bridge (three lanes in each direction)