Berty Bridge
- Owner: The Armed Forces Engineering Authority
- Client: Department of Military Engineers
- Location: Gesr El Suez, Cairo, Egypt
- Dimensions: 550 meters (Length) and 21 meters (Width)
- Total Concrete: 7000 m3
- Steel Reinforcement: 4000 tons
- Steel Structure: 710 tons
- Scope of Work: Construction of a two-way bridge (three lanes in each direction)