Berty Bridge

  • Owner: The Armed Forces Engineering Authority
  • Client:  Department of Military Engineers
  • Location: Gesr El Suez, Cairo, Egypt
  • Dimensions:  550 meters (Length) and 21 meters (Width)
  • Total Concrete: 7000 m3
  • Steel Reinforcement: 4000 tons
  • Steel Structure: 710 tons
  • Scope of Work: Construction of a two-way bridge (three lanes in each direction)