• Client: Armed Forces Engineering Authority
  • Location: Cairo, Egypt
  • Total foot print: 105,293 m2
  • Total built up area: 19,927 m2
  • Total concrete: 16, 500 m3
  • Total no. seats: 850 seats in the arena
  • Scope of work: Execution of seven arena with a total area of 35,000 m2, a race track with 600 liner meters and a conference hall of 800 seats