- Client: Armed Forces Engineering Authority
- Location: Cairo, Egypt
- Total foot print: 105,293 m2
- Total built up area: 19,927 m2
- Total concrete: 16, 500 m3
- Total no. seats: 850 seats in the arena
- Scope of work: Execution of seven arena with a total area of 35,000 m2, a race track with 600 liner meters and a conference hall of 800 seats